Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the loginizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aworldte/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/aworldte/public_html/wp-includes/functions.php on line 6114
AWORLDTEC SECURED 2 MANPOWER CONTRACTS IN A ROW FROM PCSB - AworldTec Engineering Sdn Bhd

Aworldtec has secured a new manpower contract from Petronas Carigali Sdn Bhd to supply 70 Offshore Pedestal Crane Operators to Peninsular Malaysia Assets. This is second manpower contract received by PCSB in May 2019. The contract has started on 16th May 2019 to 15 May 2020 for 1 year duration worth of RM 8million in revenue.

Earlier this month, Aworldtec has received another manpower contract from PCSB to supply 50 Material Coordinators, also at Peninsular Malaysia Assets.

Leave a Reply